Menora tunnel - Home

Tunnel menora Home

Home

Tunnel menora Flights 2020

Tunnel menora Home

Tunnel menora Study being

Tunnel menora Study being

Tunnel menora Flights 2020

Flights 2020 / 2021

Tunnel menora North

Tunnel menora Home

Home

Tunnel menora Flights 2020

Tunnel menora Study being

Flights 2020 / 2021

Additional charges for baggage.

  • A capsule was put in place that contains documents that have been cultivated by the fourth prime minister of Malaysia, Tun Dr Mahathir Mohammad in conjunction with the official opening of the North—South Expressway on 8 September 1994.

  • As of 1986, only about 350 km or two-thirds of the entire length of the expressway was completed.

  • The toll collection of the Kuala Lumpur—Seremban Expressway was from Sungai Besi to Labu.




2022 ajr.newslink.org